Case Studies
Wind Energy Oil & Gas Thermal Power
& Route Survey
Refineries
Cement Ship Buildig Engineering Infrastructure Port
Factory to Foundation      
 
Below are the list of prestigious and Critical jobs successfully executed by us at various site on pan India basis.
 
Wind Energy
Allcargo Logistics has bagged long term contracts with major wind energy companies in India to provide entire equipment consisting of main crane of 600 ton capacity plus 3 support cranes and trailers for the erection of wind turbine towers. We have erected more than 400 complete towers during the past 4 years with total safety.
 

View Video

 
Sector Crane Crane Capacity Location
Wind Power Demag CC 2800-1 (Crawler Crane) 600 TON BHUJ (Gujarat )
 
Oil & Gas
Allcargo Logistics has participated in practically every petro project, providing the 200 to 750 ton heavy cranes for critical erection.

In the above picture, our Liebherr LR 1750 (750 ton) crane is in Operation for erection of a Reactor in Hindustan Mittal Energy’s Bhatinda Refinery Project. The same crane has erected vessels ranging from 120 ton to 260 tons.
 
 
Sector Crane Weight Location
Petrochemical Complex Liebherr LR 1750 (Crawler Crane) 120 Ton & 260 Ton Guru Govind Singh Refinery –
(Bhatinda) Punjab
 
Thermal Power
Allcargo Logistics has bagged a number of contracts at various thermal power projects and one of them was the contract for girder erection at Mettur Thermal Power Plant in Tamil Nadu.

This job was carried out using Demag CC 2600 (500 Ton) capacity crane. The heaviest girder erected was 115 ton at a height of 100 meters.

Our crew competency and expertise made this execution successful, adhering to stringent safety norms.
 
 
Sector Crane Crane Capacity Weight Size Location
Thermal Power Demag CC 2600
(Crawler Crane)
500 Ton 115 Ton 10Mtr. X 0.6Mtr. X 4Mtr. Mettur (Tamil Nadu)
 
Refineries
The mission was to place 1250 ton vessel at IOCL complex, Paradip. The job was completed in association, an JV partner of Allcargo Logistics where Allcargo’s LR 1750 Crane (750 MT) crane used as a tailing crane.

This job is completed successfully by Allcargo well trained crew by adhering to stringent safety norms.
 

View Video

 
Cement
The mission was to place a 55 ton cold box at a height of 25 meters from the ground, at a radius of 22 meters with a boom length of approximate 63 meters.

The movement and placement of the crane in a running plant was a challenge due to shortage of space, which we overcame with minor dismantling and skills of the operating crew.

This is a good example of similar jobs successfully executed by us.
 
 
Sector Crane Crane Capacity Weight Size Location
Cement - Steel Liebherr LGD 1400 (Truck Mounted Lattice Crane) 400 Ton 55 Ton 3 Mtr. X 3 Mtr. X 25 Mtr. Durgapur (West Bengal)
 
Ship Building
Allcargo Logistic Ltd has a strong presence in the shipbuilding industry wherein the picture above indicates the job of placing cabins on the top of the ship. 

This movement was critical due to space constraint and superbly handled by our crew with their technical expertise and completed in stipulated time.
 
 
Sector Crane Crane Capacity Weight Location
Ship Buildig Kobelco CKE 2500 250 Ton 80 Ton Ratnagiri, Maharashtra
 
Engineering Infrastructure
Allcargo Logistics Ltd has undertaken a number of recovery jobs. The picture above shows a turbine weighing 280 ton being recovered from a river bed by utilizing our Liebherr LR 1650 (650 ton) crane. The turbine was lying in the river and was recovered successfully without any further damage.
 
 
Sector Crane Crane Capacity Weight Location
Engineering Infrastructure Liebherr LR 1650 (Crawler Crane) 650 Ton 280 Ton Bhavnagar (Gujrat)
 
Port
We undertake Turnkey contracts to handle the transportation of containers and general cargo, over dimensional cargo (ODC) and overweight cargo from ships. 

Our skilled staff ensure smooth movement of the container not only within the port or from the vessel to the warehouse, but also manage further movement till the final destination. 

We currently have a service agreement with a major customer in the industry and have been providing incident free operations for several years. 

Our stringent safety norms and preventive maintenance of our vehicles are always keeping us ahead of the competition.
 
 
Factory to Foundation
 
Client:
NCC Ltd., the Hyderabad based engineering company.
 
Project:
NCC is setting up a 1320MW Thermal Power Plant at Krishnapatnam, Nellore district of Andhra
Pradesh.
 
The Business Need:
Allcargo Global Logistics Ltd. was appointed as the complete logistics provider for the Thermal
Power Plant project to be commissioned at Nellore, Andhra Pradesh by NCC.
 
The scope of work was:
Transportation from Tianjin to Shanghai Port
Ocean Freight – Shanghai Port to Kakinada Port
Custom Clearance and Documentation
In-transit warehousing
Onshore transport from Kakinada to Nellore Plant
Unloading of equipment at side
Grider and Boiler Unit Erection for Thermal Power Plant